Tracking issue for the current state of the dataset publishing pipeline. Based on a review of all 29 open issues; full assessment: dataset-publishing-feasibility.md (branch claude/dataset-publishing-feasibility-u2ju1x).
Headline: only 4 datasets need actual data work to finish — 8 more are technically ready but blocked solely on author consent. Consent follow-up, not data work, is the pipeline bottleneck.
[data]: What a Waste Global Database #23 What a Waste (World Bank) — verify CC BY, good student/hackathon project (2026-09-14: data#23 closed; package at openwashdata/whatawaste, deposit on whatawaste#1)
[data] Sierra Leone WASH data portal #27 Sierra Leone portal — unscoped since 2024; 1-hour scoping pass (2026-09-14: data#27 closed; package at openwashdata/washdataportalsl, deposit on washdataportalsl#1)
Tracking issue for the current state of the dataset publishing pipeline. Based on a review of all 29 open issues; full assessment:
dataset-publishing-feasibility.md(branchclaude/dataset-publishing-feasibility-u2ju1x).Headline: only 4 datasets need actual data work to finish — 8 more are technically ready but blocked solely on author consent. Consent follow-up, not data work, is the pipeline bottleneck.
Ready or nearly ready — close-out pass
unhcrwashpackage exists; add GitHub Actions refresh, finish docs, closechckapmalawiexists; fix citation, closeclimatevulnerabilitykhmrepo created 2023; resume and finish (2026-09-14: data#4 closed; remaining work on Deposit on Zenodo so the package is citable climatevulnerabilitykhm#4)jmpinputin progress and funded; confirm current ownership, avoid duplicatingWASHNote/jmpwashdata(2026-09-14: jmpdata 0.1.0 released 2026-08-20; data#3 closed; deposit on Deposit on Zenodo so the package is citable jmpdata#24)Blocked on author consent (ds4owd capstones)
Suggested cadence: reminder at 1 month, close at 3 months as "no consent" (as done for #42).
Feasible — needs scoping / license check / design decision
Low feasibility / low priority as framed
Scheduled / housekeeping