Skip to content

Proof of Ship - Celo Builder Program#2914

Merged
yizhao-ec merged 6 commits into
electric-capital:masterfrom
GigaHierz:GigaHierz/proof-of-ship-celo-builder
Jul 3, 2026
Merged

Proof of Ship - Celo Builder Program#2914
yizhao-ec merged 6 commits into
electric-capital:masterfrom
GigaHierz:GigaHierz/proof-of-ship-celo-builder

Conversation

@GigaHierz

Copy link
Copy Markdown
Contributor

Adds 368 Celo repositories from the Proof of Ship builder program submissions, in a single migration file (migrations/2026-06-30T130000_add_celo_proof_of_ship).

Methodology (matching prior Celo submissions):

  • The submission list spanned multiple ecosystems; it was filtered to projects that actually build on Celo — Celo referenced in the repository name, description, topics, or README.
  • Every repository link was verified live against the GitHub API; dead/404 links were dropped.
  • Repositories were de-duplicated, and any already present in the taxonomy (or in the concurrent H1 2026 Celo PR) were excluded.

Validated with open-dev-data validate — passes.

GigaHierz and others added 6 commits December 8, 2025 21:57
Add 368 Celo repositories from the Proof of Ship builder program
submissions. Submissions were filtered to projects that build on Celo
(Celo referenced in name, description, topics, or README); links were
verified live and de-duplicated against the existing taxonomy.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
@yizhao-ec yizhao-ec merged commit d2fa0f4 into electric-capital:master Jul 3, 2026
1 check passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants